Somewhere under the yard there's a pipe that carries everything from your house to the city sewer. In Cheyenne, that pipe is yours, all the way to where it meets the main.

Here's what the Cheyenne Board of Public Utilities (BOPU) says you own, what it owns, how the water line changed in 2022, and what to check before you buy.

These rules are BOPU's. If your water and sewer bill comes from a different provider, ask that provider for its own rules.

The sewer line: yours from the main to the house

BOPU's Property Owner's Responsibility page puts it plainly. The property owner owns, repairs and maintains the private sanitary sewer line from the connection point at BOPU's sewer main, which BOPU calls the Wye, all the way to the building.

BOPU's side is the city-owned mains. BOPU says it maintains, repairs and replaces those, and that its crews clean about 100 miles of sewer main a year and replace or rehabilitate up to 3 miles of main a year.

What that means in practice, from BOPU's own pages:

  • A blockage in your service line is the property's responsibility, and BOPU says you may need a plumber.
  • A plug in the City's main is BOPU's. Its crews restore the flow.
  • Damage from a service line or inside plumbing isn't BOPU's responsibility.
  • Cleanup after a backup inside a building belongs to the occupant or owner.

The water line: the 2022 change

The water side changed recently. BOPU's Lead Service Line Response Plan says that until 2022, BOPU didn't own or maintain service lines beyond the connection at the water main.

Since 2022, BOPU describes itself as a split-ownership utility:

  • BOPU owns the line from the water main through the curb stop, which is the shutoff valve near the property line.
  • You own the line from the curb stop to the house, plus the shutoff inside.

The water meter is BOPU's property, but BOPU says protecting it from freezing or damage is on the owner. A frozen meter can leak and flood the property, and if there was negligence, a replacement meter may be at the owner's expense. BOPU also says not to enclose a meter behind a wall without direct access.

What the pipes might be made of

BOPU's response plan gives a short history of Cheyenne's service lines:

  • Lead components were common in service connections, especially between the main and the curb stop, going back to the start of the system in 1877.
  • Galvanized pipe often ran from there to homes and businesses.
  • Copper began replacing lead and galvanized pipe in new installations by the 1930s.
  • Lead use dropped sharply between the 1950s and 1985, and lead components were banned in 1986 under the federal Safe Drinking Water Act.

BOPU keeps a Lead Service Line Inventory with a public map. Because records before 2022 are thin, BOPU says it classified most services as "unknown" in the first inventory.

In September 2025, BOPU collected 30 tap water samples. Three came back above the EPA's lead action level of 15 parts per billion, all northwest of East Pershing Boulevard and Evans Avenue. BOPU says all three were first-draw samples taken straight from the faucet, which it says suggests the lead likely came from plumbing inside the home. BOPU says homes built before 1989 are more likely to have plumbing that can add lead and encourages those customers to reduce their exposure. It also says it isn't a certified lab for lead testing and recommends testing through one. Its lead program email is leadfree@cheyennebopu.org.

Who can work on the line

If a sewer or water service line needs repair or replacement, a few City and BOPU rules come into play:

  • Work in the street or sidewalk. The City's FAQ says all work in the public right-of-way needs a right-of-way permit. The City's right-of-way permit application says no permit is approved unless all the work is covered by a licensed contractor.
  • Sewer connections. BOPU's Infrastructure Policies and Design Criteria say all sewer service taps and connections have to be made by a contractor licensed by the City of Cheyenne, after a BOPU tap permit is issued, and BOPU inspects taps and connections before they're backfilled.
  • Size and setup. The same document sets a 4-inch minimum for sewer service lines, says each building needs its own separate sewer service line, and says no sump pumps or roof drains can connect to the sanitary sewer.
  • Building permits. For a permit question on the house side, call the City's Building Department at 307-637-6265.

What to check during an inspection

A standard home inspection looks at what's visible. The service lines are mostly underground. Here's what I'd add or ask for on a Cheyenne purchase:

  • A sewer camera inspection of the full line, from the cleanout to the main, with the video and the footage markers saved to your file. Ask the inspector to note where any problem sits, so you know whether it's in the yard or under the street.
  • The cleanout. Ask where it is. If there isn't one, ask what the camera inspection will need.
  • Root history. BOPU recommends an annual root maintenance program, and says any crack or loose joint lets water vapor escape, which draws roots to the pipe. Ask the seller if the line has been cleaned or treated, and when.
  • Backups. Ask the seller about any past sewer backups and who responded.
  • Water line material. Look at the pipe where it comes into the house near the meter, check the address on BOPU's lead service line map, and on an older house, ask your inspector about the line's material.
  • Sump pump and downspouts. Confirm where they discharge. BOPU's design rules don't allow them to tie into the sanitary sewer.
  • Insurance. BOPU says to check with your insurance agent about whether water or sewer damage is covered on your policy.

We'll tell you the truth about what the inspection finds on every house. The choice is always yours.

I'm not a plumber or an insurance agent. For a repair estimate or a coverage question, call a licensed plumber or your agent.

Who to call

  • Sewer backups, after-hours water and sewer emergencies, and maintenance requests: BOPU at 307-637-6471. BOPU says its crews respond to sewer calls 24/7.
  • Customer service and meter questions: 307-637-6460.
  • In person: 2416 Snyder Ave., Cheyenne, Monday through Friday, 9 a.m. to 4 p.m.

Next step

Our free Buyer Guide covers inspections and every deadline in a Cheyenne purchase. If you want help planning the inspections for a house you like, text me at 307-317-5372. We're licensed in Wyoming and Colorado.

Quick answers

Who is responsible for the sewer line in Cheyenne?
The property owner. BOPU says the owner owns and maintains the private sewer line from the connection at BOPU's main, the Wye, to the building.

Who owns the water service line in Cheyenne?
Since 2022, BOPU owns the line from the main through the curb stop, and the property owner owns it from the curb stop to the house.

Who do I call for a sewer backup in Cheyenne?
BOPU at 307-637-6471, 24 hours a day. If the plug is in the City's main, BOPU crews clear it. If it's in your service line, you may need a plumber.

Does Cheyenne have lead service lines?
BOPU says lead components were used from 1877 and keeps a public inventory map, but most lines are listed as unknown because older records are limited.

Cody Harvey

The Harvey Home Team | Compass
Call or text 307-317-5372

Sources

Facts checked November 22, 2026.

  • Owner owns sewer line from the Wye and water line beyond the curb stop, BOPU maintains mains, not responsible for service line damage, meter freezing and replacement, meter access, insurance, City Code 13.08.010 to 13.08.040, contacts and hours: BOPU, www.cheyennebopu.org
  • Sewer backups: 307-637-6471, 24/7 crews, main vs. service line, owner cleanup: BOPU, www.cheyennebopu.org
  • Annual root maintenance, cracks and loose joints draw roots, about 100 miles of mains cleaned and up to 3 miles replaced yearly: BOPU, www.cheyennebopu.org
  • Ownership change in 2022, history of lead, galvanized and copper lines, 1986 ban under the Safe Drinking Water Act: BOPU Lead Service Line Response Plan, www.cheyennebopu.org
  • Split ownership since 2022, inventory map, most lines unknown: BOPU, www.cheyennebopu.org
  • September 2025 sampling, 3 of 30 over 15 ppb, location, first-draw samples point to in-home plumbing, pre-1989 homes, BOPU not a certified lab, email: BOPU, www.cheyennebopu.org
  • Sewer taps by City-licensed contractor with BOPU tap permit, BOPU inspection before backfill, 4-inch minimum, separate service per building, no sump pumps or roof drains: BOPU Infrastructure Policies and Design Criteria, www.cheyennebopu.org
  • All work in the right-of-way needs a right-of-way permit, Building Department 307-637-6265: City of Cheyenne FAQ, cheyennecity.org
  • Right-of-way permit requires a licensed contractor: City of Cheyenne Engineering, www.cheyennecity.org